Powered By Kitlog Pro v2.0
My RV-8 build
RV-8
Empennage
10-3-2012
< Previous Log Entry
Next Log Entry >
Date:
10-3-2012
Number of Hours:
0.50
Manual Reference:
Page 6-5
Brief Description:
Closing up the vertical stab
The vertical stab was closed up. The squeezer made quick work of the spar to skin rivets and the pop-rivets were used to attach the spar to the ribs.
I received my fibreglass order supply from Aircraftspruce. Once I get everything buttoned up, I'll move onto the glass work.
Spar clecoed in place
Skin riveted to spar
Spar riveted to ribs
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
452
866
About me
1
1
Avionics
3
4
Canopy
3
6
Electrical
4
6
Empennage
74
120
Engine
6
10
Finishing Kit
2
2
Flying
3
4
Fuselage
147
353
Instruments
2
0
Miscellaneous
14
36
Panel
7
17
Practice Kits
1
1
Tools
6
16
Wings
178
287
Workshop
1
3
Copyright © 2001-2024 Matronics. All Rights Reserved.